Current Work
The following is a current snapshot of work Glass Earth Gold is undertaking as of February 2013. For more detail on current key projects please click on project names below, or to receive breaking news and results as they arise please [click here].
WKP West - results from the various phases of drilling (WKP24-35) have been released with very encouraging results e.g. WKP 31 9.7m of 17.2 g/t gold and 24.2 g/t silver . A 2,500m diamond drilling programme along with additional CSAMT is scheduled for 2013. Read the recent news release here
Muirs - Ongoing drilling following recent channel sampling has provided encouraging results with continuous quartz veining and confirmation of broad lower grade material from surface. Recent news release here.
Garibaldi - New discovery "Garibaldi" in the South Island is characterised by a network of quartz veins from which systematic soil and bedrock trench samples have returned grades ranging up to 16.1 g/t Au. The zone of interest is 900m in strike length and 300m wide. A programme of ground magnetics has recently been completed with interpretation of the data underway. Read the recent news release here
Ophir - evaluation and mine planning ongoing.
Placer production - placer gold production being ramped up. Additional resource definition and permitting of new sites is ongoing.

